Key facts

  • The DuPont schedule is a 28-day cycle with four crews.
  • Each crew works 14 twelve-hour shifts, or 168 hours, per cycle (42 hours a week on average).
  • Overtime changes with the day the workweek starts.
  • Each cycle includes 7 days off in a row.

What is the DuPont schedule?

The DuPont schedule is a 12-hour rotating shift pattern that runs on a 28-day cycle with four crews. At any time one crew works the day shift, one works the night shift, and two crews are off, so the site is staffed 24 hours a day, 7 days a week.

Each crew works 14 twelve-hour shifts in 28 days: 168 hours, or 42 hours a week on average. It also gets long breaks, including one block of 7 days off in a row every cycle.

The 28-day pattern

DaysWhat you do
1 - 44 night shifts
5 - 73 days off
8 - 103 day shifts
111 day off
12 - 143 night shifts
15 - 173 days off
18 - 214 day shifts
22 - 287 days off

Then the cycle starts again. Variations exist: some sites begin the cycle with days, or use 8-hour or 10-hour shifts. Check your own roster; the calculator above uses this common version with 7 day shifts and 7 night shifts.

Hours and overtime on a DuPont schedule

The average is 42 hours a week, but no single week is 42. In the example below (a crew whose first night is Monday 2 November 2026, with 7:00 AM and 7:00 PM shifts), the four weeks of the cycle add up to 168 hours but split very unevenly, depending on where the payroll workweek begins:

Workweek starts onHours in the 4 workweeksOvertime hours per 28 days
Sunday, 12:00 AM53 + 55 + 12 + 4836
Monday, 12:00 AM48 + 65 + 55 + 048
Friday, 12:00 AM43 + 48 + 36 + 4112

Same crew, same shifts, same hours worked. Only the day the workweek starts changes, and overtime moves between 12 and 48 hours per cycle. Under the Fair Labor Standards Act the employer sets the workweek, keeps it fixed, and may not move it to avoid overtime (29 CFR 778.105). Enter your own start date and workweek in the calculator.

Some employers also pay shift premiums or scheduled overtime. These vary by employer and are not included here: this calculator shows only the federal rule (over 40 in a workweek) or no overtime. Ask your employer about premiums.

Hospitals and residential care establishments can use a different system, 8 and 80, by prior agreement with the employee. Everyone else uses the 40-hour workweek (DOL Fact Sheet #54). The 2-2-3 schedule page shows both side by side.

Where the DuPont shift schedule comes from

The pattern was developed inside the DuPont chemical company, generally dated to the 1950s, to keep expensive plant equipment running day and night while giving workers predictable time off. It is still used where operations never stop: manufacturing and chemical plants, utilities, oil and gas, hospitals, and emergency services such as police and fire.

The logic is simple. Four teams cover seven days a week, round the clock, and each team gets a full seven days off every four weeks, so employers staff a 24-hour operation without paying for a fifth crew.

Sleep, fatigue and safety on 12-hour shifts

Shift work and long hours are linked with disrupted sleep and body-clock rhythms, and with higher health and safety risks, according to the CDC's NIOSH. A DuPont schedule has both: 12-hour shifts and blocks of up to four night shifts in a row. NIOSH describes 12-hour shifts as something to use with caution, with mixed results on sleep, alertness and safety.

If you work this rotation, plan sleep around the change from nights to days, and use the calendar above to see exactly when your long breaks fall. Employers can lower the risk by watching total hours, limiting extra shifts and giving workers a say in swaps.

How the four crews fit together

The crews are the same pattern shifted by 7 days: Crew 2 starts one week after Crew 1, Crew 3 two weeks after, and Crew 4 three weeks after. That is why there is always exactly one day crew and one night crew. The calculator draws all four crews for your cycle so you can see who covers you, and when your days off line up with a weekend.

For other rotating patterns, see the 2-2-3 schedule calculator, which uses a 14-day cycle, or the shift hours guide for typical 1st, 2nd and 3rd shift times.

Pros and cons of the DuPont schedule

  • Pros: long blocks of time off, including a 7-day break every cycle; 24/7 coverage with only four crews; fewer shift changes than many rotations.
  • Cons: 12-hour shifts are tiring; night shifts four nights in a row; weeks of very different length make pay and overtime harder to predict.

TimeCardPal gives estimates for planning and checking pay. It is not legal, tax or payroll advice. Rules vary by state, employer and job type; check with your state labor department or a payroll professional for your situation.

Frequently asked questions

What is the DuPont schedule?

The DuPont schedule is a 12-hour rotating shift pattern with four crews on a 28-day cycle. Each crew works 14 shifts, 7 on days and 7 on nights, and has 14 days off, including one block of 7 in a row.

How many hours a week is a DuPont schedule?

It averages 42 hours a week, because a crew works 168 hours in 28 days. Individual workweeks can be anything from 0 to over 60 hours, depending on where the workweek is set to start.

How many days off does the DuPont schedule have?

14 days off in every 28-day cycle, in blocks of 3, 1, 3 and 7 days. The 7-day block is the longest break.

How is overtime calculated on the DuPont schedule?

Under federal law, overtime is every hour over 40 in a fixed workweek. Because DuPont weeks are uneven, the overtime depends heavily on the day the workweek starts. The calculator above shows it for every start day.

How many crews are on a DuPont schedule?

Four. Each crew follows the same 28-day pattern shifted by 7 days, so there is always one crew on days, one on nights and two off.

What is the difference between DuPont and 2-2-3 schedules?

DuPont runs 28 days with 14 shifts; the 2-2-3 runs 14 days with 7. Both average 42 hours a week. The comparison table is on the 2-2-3 schedule page.

Does the DuPont schedule start with days or nights?

It varies by site. The version in the calculator starts with 4 nights. Some sites start the cycle on days. Count from the first shift in your own roster and enter that date.

Is the DuPont schedule good for work-life balance?

It depends on the person. The 7 days off in a row every 4 weeks are a big plus. The long 12-hour shifts and the blocks of night shifts are the hard part. This calculator shows the exact calendar so you can see both before you decide.

Where does the DuPont schedule come from?

It was developed at the DuPont chemical company, generally dated to the 1950s, as a way to run a plant 24 hours a day with four crews on 12-hour shifts.

Which industries use the DuPont schedule?

It is most common where work never stops: manufacturing and chemical plants, utilities, oil and gas, hospitals and emergency services. Check your own roster, because many sites change the pattern.

Is the DuPont schedule bad for your health?

It depends on the person and the site. NIOSH links night shifts and long hours with disrupted sleep, fatigue and higher safety risks, and the 7-day break every cycle helps recovery. Good sleep habits and limits on extra shifts matter most.

Cite or link to this page

If this page helped your readers, you are welcome to link to it.

TimeCardPal. “DuPont Schedule Calculator.” https://timecardpal.com/dupont-schedule/ (accessed 2026).